Event Date: 08 August 2011
Abraj Fleet Expands with 2 New Rigs
Two (2) 1500 HP, fast moving rigs have been added to Abraj Rig Fleet.
These Rigs have been deployed with Occidental of Oman for their drilling operations in Safah Field (Rig 205) and Wadi Latham (Rig 206) in Q2 2011.
With this addition, Abraj has now 9 rigs in operation, working for different Clients in Oman. |
Event Date: 08 August 2011
Abraj Fleet Expands with 2 New Rigs
Two (2) 1500 HP, fast moving rigs have been added to Abraj Rig Fleet.
These Rigs have been deployed with Occidental of Oman for their drilling operations in Safah Field (Rig 205) and Wadi Latham (Rig 206) in Q2 2011.
With this addition, Abraj has now 9 rigs in operation, working for different Clients in Oman. |
|